Cybex International: Plant Tour (10AM)
Sorry as of 9/5/08 the tour is filled
About Cybex
The Owatonna
facility builds strength products from the ground up. CYBEX designed and built
this state-of-the-art manufacturing plant in 2007 to provide its highly skilled
workforce with the most efficient manufacturing tools
available. The new Owatonna manufacturing facility is located on 36 acres and
measures 340,000 square feet
(or eight football fields) under one roof. The Owatonna facility is home of the
Arc Trainer, Eagle, VR3, VR1,
VR Plate Loaded, and Modular strength lines.
We will tour
manufacturing, assembly and special emphasis on their new powder coat system,
which includes
an in line blasting system.
Location: 1975 24th Ave SW,
Owatonna, Minnesota, 55060
Phone: 507 455-0217
Times: Registration: 10 AM
Short Presentation and Tour Group Formation 10:15 AM
Tour: 10:30 AM
Q&A / lunch in the Cybex Training Room 12 Noon
Cost: $10 for members, $25 for non-members
Tour is
limited to 60 people. Pre registration is required - please register by Friday,
Sept. 12.
Because of the tour size limit, TC-CCAI reserves the right to limit the
number of attendees from
any one company to allow for greater participation from as many companies
as possible.
Cybex reserves the right to exclude attendees from companies that compete with
them in the
strength/fitness market.
Reservations: Call/email Phil at 320-230-6282 / ccatc@charter.net
by Friday Sept, 12, 2008

Cybex management team pose with their TC-CCAI Tour Event Award Brad Stilwagon of Cybex gives a presentation during lunch time at the Cybex tour

Deb Savage receives TC Chapter Vendor of the Year Award from
President
Chapter President Pat Cullen presents plaque of appreciation to Angela Kokesh &
Doug Martell of Life Fitness56.jpg
Pat Cullen during the Cybex tour mtg